Leave a Message

By providing your contact information to Angel Kennedy, your personal information will be processed in accordance with Angel Kennedy's Privacy Policy. By checking the box(es) below, you expressly consent to receive marketing or promotional real estate communication from Angel Kennedy in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. Consent is not a condition of purchase of any goods or services. You may opt out of receiving further communications from Angel Kennedy at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe. SMS text messaging is subject to our Terms of Use.

Thank you for your message. I will be in touch with you shortly.

Explore My Properties
What's Actually Open on Woodstock's Trail Network Right Now (and What's Still Dirt)

Woodstock GA Trail System: What's Open and What's Next

Ride the Noonday Creek Trail south from downtown on a Saturday morning and you'll cross the bridge behind Woodstock Arts, pass the dog park, and eventually run out of pavement at Highway 92. That dead end has been there for a couple of years now, and every summer somebody posts on a neighborhood forum asking if this is finally the year it connects through to Cobb County. It's a fair question. The city has been promising that link since a December 2023 groundbreaking, and the promise keeps sliding.

Here's what's actually true about Woodstock's trail and park system as of this summer: parts of it are finished and genuinely good right now. Parts of it are still boardwalk framing and poured concrete you can watch dry. And the city's own communications don't fully agree with each other on when the biggest piece of it opens. If you already live here and use these trails, that gap between the pitch and the pavement is worth knowing before you plan around it.

Where the Trail Actually Ends Right Now

The Noonday Creek Trail extension is a 1.5-mile connector meant to link Woodstock's existing trail to Cobb County's Noonday Creek Trail at a trailhead near Noonday Park on Shallowford Road. Construction started in January 2024. The original target was sometime in 2025. By June 2025, WSB-TV was reporting that weather delays had pushed completion to spring 2026, with a city official noting the low-lying project site near the creek causes lingering problems even after rain stops.

Spring 2026 has already come and gone by the time you're reading this, so the honest answer is that the gap may finally be closed, or it may not be. There's no fresher public update confirming a ribbon cutting. If you haven't ridden past the 92 crossing since spring, this is worth checking in person rather than assuming.

The reason it matters beyond the inconvenience of a dead end: once connected, Woodstock's trail ties into a network that actually goes somewhere. Cobb County's side of Noonday Creek Trail runs seven miles from the Bells Ferry Road trailhead to Kennesaw Mountain National Battlefield Park, and Cobb's system is designed to eventually tie into the Silver Comet Trail, a paved route that runs 61.5 miles to the Georgia-Alabama state line. At the December 2023 groundbreaking, Mayor Michael Caldwell framed it this way:

"We are so excited to finally get to tie into a strong, existing, trail-focused community in Cobb County and become the bridge into the rest of Cherokee County through this connection."

That's the long game. The short game, for now, is a trail that starts strong downtown and still stops short of the county line.

The Park Nobody Can Quite Agree Is Finished By When

The bigger story this year isn't the connector, it's Little River Park, a roughly 110-acre site that will become Woodstock's largest park and double the city's total greenspace. Voters approved the parks bond that funds it back in 2023, with 87 percent support, and the city broke ground on August 5, 2025.

The park is being built in three zones, the Trickum Road Park Zone, the Linear Corridor Zone, and the Woodlands Park Zone, and it's designed to eventually include a lake for fishing and paddling, a water trail connecting to Olde Rope Mill Park, new playgrounds, and a trail corridor running the length of Little River from Trickum Road to the Woodlands subdivision.

Here's the part worth knowing if you're the kind of resident who plans a fall birthday party or a spring soccer season around a park opening: the city's own sources don't agree on the completion date. One City of Woodstock news release puts completion at August 2026. The Cherokee County Chamber of Commerce and WSB-TV's groundbreaking coverage both say fall 2026. The Tribune Ledger News says the city estimates completion by the end of 2026. Three official-adjacent sources, three different seasons.

Part of the slippage makes sense once you know the construction sequencing. Phase 2 of Little River Park sits next to the Trickum Road at Nocatee Trail Roundabout Project, a separate road job that's also still under construction. The park's contractor has to finish phase one first, then wait on the roundabout before finishing phase two, since the roundabout is what will eventually serve as the park's main entrance. As of the city's construction log through April 2026, crews were still pouring concrete trailway, driving pilings for boardwalks, and grading the Trickum Road playground. That's real progress. It's also not a park you can walk into yet.

What's Already Worth a Saturday Morning

None of this means Woodstock is short on trails to actually use today. The newer projects get the headlines, but the existing network has been solid for a while.

  • Dupree Park, the city's oldest, has an 18-hole disc golf course (the Prodigy Par2 Challenge), a third-mile walking track, six pickleball courts, a fishing pond with a boardwalk and dock, and a family-friendly mountain bike skills course with four named segments, Lions, Tigers, Bears, and Oh My.
  • Olde Rope Mill Park, just north of the Outlet Shoppes at Atlanta, is home to the Taylor Randahl Memorial Mountain Bike Trails, three trails totaling 14 miles that range from smooth flow lines to advanced cross-country terrain. The park also has canoe, kayak, and paddleboard access to Little River, plus historical markers explaining the site's original cotton rope mill from the 1800s.
  • Woofstock Dog Park doubles as the trailhead for both the Noonday Creek Trail and the Towne Lake Pass, and sits on the former site of the Walden Chase apartment complex, which was destroyed by flooding in September 2009.
  • Rubes Creek Trail, a shorter 0.7-mile concrete path funded by a GDOT Transportation Enhancement Grant, connects near Fire Station 14 on Arnold Mill Road and will eventually feed into the city's planned Downtown Loop.

All of this fits inside a much larger ambition. The city's Greenprints master plan, adopted back in 2008 and still guiding development today, calls for more than 60 miles of trail and open space across Woodstock. What's built and open right now is a meaningful piece of that vision, not the whole thing, and the gap between the master plan number and what you can currently ride end to end is exactly why the extension and Little River Park matter so much to close.

The Unofficial Trailhead Turned Living Room

If there's a social center to all this trail activity, it's not a trailhead sign, it's Reformation Brewery on Elm Street. The Noonday Creek Trail itself begins at Woodstock Arts, right behind the brewery, which makes the taproom and its adjacent Elm Street Green the natural stopping point before or after a ride.

The programming there runs on a rhythm rather than one-off events. Market Mornings happen on Saturdays before the downtown farmers market gets going. Sunday Funday brings early yoga on the green followed by live music and a Maker's Market. This spring, that rhythm scaled up for two dated events: the Georgia Craft Brewers Festival on April 11, which brought more than 50 Georgia breweries and 150-plus beers to the green along with live music from the Steele Peach Band, and Elm Fest on April 25, a plant-and-art afternoon that opened with a ribbon cutting sponsored by Top Tier Trees and included vendors like The Bloom Exchange and a live painting session from artist Chase King.

Both of those have already happened this year, but they're the kind of annual fixture worth building next spring's calendar around if you missed them, since the pattern of an April festival season on that green has held for a while now.

What This Adds Up To If You Already Live Here

The honest version of Woodstock's trail story this year isn't "everything is open" or "everything is delayed." It's that the city is mid-build on its two biggest additions in a decade, the numbers on the ground don't always match the press releases, and the older parks quietly hold up their end without needing an update. If you're already out on these trails most weekends, the useful move right now is simple: check the Highway 92 crossing in person before you plan a long ride around it, and don't pencil Little River Park onto anyone's calendar until you've seen the ribbon cut yourself.

If you're weighing whether Woodstock's ongoing investment in trails and greenspace fits into a longer-term move, or you're already here and curious what it means for your home's place in the neighborhood, Angel Kennedy is always glad to talk through it. Let's Connect.

Buy & Sell With Confidence

Get assistance in determining current property value, crafting a competitive offer, writing and negotiating a contract, and much more. Contact me today so I can guide you through the buying and selling process.

Follow Me on Instagram